FINECO OA Cable enkawl dan Raised Floor System a ni
Office Power, Data & IT Infrastructure atana hman tur Profile Modular Access Flooring hniam-
FINECO OA raised flooring hi engineered, modular access system a ni a, sumdawnna office, IT room, control room, leh telecom facility hrang hranga siam a ni. Power, network, leh communication cable-te tan finished floor hnuaiah service zone accessible a siam a, chu chuan workspace mumal tak, hazard-free a siam a, chutih rualin space reconfiguration-a rang taka insiamrem theihna a siam bawk.
Technical Specifications & Ram hrang hranga tehfung hrang hrang
|
Parameter a ni |
Specification & Standard zawm dan tur |
|
Product chi hrang hrang |
OA Cable enkawl dan Raised Floor System hmanga enkawl a ni |
|
Testing Standard hrang hrangte |
A rilru a hah lutuk chuan a rilru a buai em em a, a rilru a hah lutuk chuan a rilru a buai em em bawk a. 12825 / AS/NZS 4111 / MOB PF2 PS |
|
Kangmei & Hriselna lama hnathawh dan |
Class 0 / Class A (ASTM E84 Non-Kang thei lo) 1. A rilru a hah lutuk chuan a rilru a buai em em a. |
|
Electrostatic hmanga venhimna a ni |
ESD Compliant (Anti-Static Options a awm) |
|
Support Structure a ni |
Heavy-Duty Galvanized Steel hmanga siam theih Pedestal System |
|
Finished Floor san zawng (FFH) 1.1. |
Customizable (40mm atanga a chunglam low-profile options) |
|
Quality Certification te pawh a awm bawk |
ISO 9001, ISO 14001 nena inmil thil siam chhuah |
|
Surface Finish duhthlan tur a awm |
Bare/Factory Finish (Carpet Tiles atan), HPL, PVC / Vinyl hmanga siam a ni |
Core Product A thatna te
Infrastructure hmantlak & EMI humhalhna:Floor hnuaiah high-density power leh data line te chu a inrualrem reng a, electromagnetic interference (EMI) tih tlem nan physical power-data separation a support bawk.
Rapid Layout siam thar lehna:Removable panels hmang hian cable pathways-ah instant access a awm a, hei hian structural demolition emaw office downtime emaw awm lovin workstation adds, moves, and changes (AMCs) a ti thei a ni.
Low-Profile Space tihchangtlun dan:Finished floor heights (FFH) chu low-clearance profile atanga tan a ni a, retrofit leh space{1}}constrained renovation atan a tha hle a, chutah chuan conventional raised floors tih theih loh a ni.
Floor Trenching tihbo a nih chuan:Permanent concrete coring leh floor chasing a thlak a, building life-cycle modification cost nasa takin a tihhniam.
System hman dan tur
Sumdawnna Office Building hrang hrang:Hnathawhna hmun, corporate headquarters, leh executive boardroom te hawn-plan rawh.
IT Infrastructure leh Control Room hrang hrangte chu:Server-a kianga awm, network control hub, leh dispatch center te.
Telecom hmanrua leh Call Center hrang hrang:High{0}}density workstation zone-ah chuan power-data sem darh chhunzawm zel a ngai a ni.
Zirna & Mipui Hmun hrang hrang:Computer lab, tunlai library, leh training facility inthlak danglam thei te a awm bawk.
Renovation & Retrofit Project hrang hrang: 1.1.Commercial space hniam-Cable infrastructure tihchangtlun ngai.
Engineer hmanga Component siam dan tur
Modular Panel lakchhuah theih te:Steel emaw specialized core panel zawng zawng chu dimensional stability sang tak, uniform thickness, leh specific load capabilities atana engineered a ni.
Steel Pedestal rit tak tak-Duty tak tak te:Precision height-adjustable pedestals, locking mechanism hmanga floor leveling dik tak leh structural stability neih theihna tur.
Cable Trunking kawng hrang hrang inzawmkhawm:Power leh high-speed data cable te chu routing thianghlim, systematic tak leh spatial separation theihna tur dedicated channels.
Service Outlet hrang hrangte chu a duh ang anga siam theih a ni:Floor box inzawmkhawm, workstation node-a direct-a flush-mounted power, RJ45 data, HDMI, leh telecom connection pe thei.
Standard Installation a awm dan tur
Site Survey & Subfloor buatsaih dan tur: 1.1.Subfloor levelness, thianghlimna, leh finished floor height dik tak (FFH) te enfiah rawh.
Grid Layout leh Marking siam dan:Pedestal grid node, primary cable trunking runs, leh service drop point te chu dawr lem pawmpui angin map rawh.
Pedestal awmna tur leh a level dan tur:Pedestal te chu subfloor-ah secure la, laser leveling tools hmangin precision-adjust rawh.
Cable Routing & Pathway siam dan tur: 1.1.Primary power conduit, network trunking, leh floor box housing te chu dah chhuak rawh.
Panel Install dan leh Alignment: 1.1.Pedestal head-ah modular panel dah la, flush seam leh panel stability a awm theih nan.
Testing & Sign hnuhnung ber-Off:Handover hmain grounding continuity check, leveling verification, leh structural stability inspection te neih thin tur a ni.
Sumdawnna lam hawi, Support & Delivery
Order zat tlem ber (MOQ): 1.1.Flexible MOQ hian commercial retrofit tenau leh architectural project lian-scale te pawh a pui thei (Standard stock items chu thawn nghal theih a ni).
Policy entir nan:Architect/engineer evaluation (freight collect) atan a thlawna material sample kit a awm bawk.
Quality Assurance neih theihna tur:Standard kum 5 chhung atan structural warranty a awm a, panel, pedestal, leh structural accessories te a huam tel bawk.
Production & Lead hun chhung:Standard configuration hrang hrangte tan calendar ni 15–20 chhung; project volume khatah custom project order ruahman a ni.
Engineering lama tanpuina:BIM/CAD dawr drawing coordination, technical submittal package, leh installation technical support te a thlawna pek theih a ni.
Export atana hman tur Packaging: 1.1.Panel leh components te chu heavy-duty, moisture-protected, fumigated wooden pallets-a secured, reinforced corner guards hmanga tuifinriata bungraw phurh himna tur.
Zawhna Zawh fo thin
Q: Structural load ratings atan third-party test report (eg, SGS, TÜV) a awm em?
A: Ni e. Engineering submittal package atan hian technical data sheet kimchang leh CISCA leh EN 12825 standard nena inmil third{1}}party test report pek theih a ni.
Q: Engtin nge system hian low-ceiling office siamthat hna hi a enkawl?
A: Kan low-profile configuration te hian vertical floor-to-ceiling clearance a ti sang a, chutih rualin power leh structured network cabling atan underfloor access kimchang a pe bawk.
Q: Power leh high-speed network cable te hi floor hnuaiah routed theih a ni em?
A: Ni e. High{1}}voltage power line leh data cable inkara electromagnetic interference (EMI) awm loh nan layout plan-ah hian dedicated trunking pathways leh spatial separation rules te dah tel a ni.
Q: Formal project quote pek chhuah nan eng technical details nge mamawh?
A: Khawngaihin floor area zawng zawng (m2/sq ft), finished floor height duh zawng (FFH), targeted load mamawh, surface finish duh zawng, leh floor layout emaw CAD drawing a awm chuan pe rawh.
hot tags .: oa cable enkawlna raised floor system, China oa cable enkawlna raised floor system siamtu, supplier, factory
