Extra-Heavy-Duty sang tak nei Access Floor System

Inquiry thawn rawh .
Extra-Heavy-Duty sang tak nei Access Floor System
Kimchang
Solid steel shell injected vel a siam niin, high-density, lightweight cementitious core emaw high-strength calcium sulfate core emaw hmanga inject a ni a, he system hian high{2}}capacity cabling leh underfloor air distribution (UFAD) atan rigid underfloor plenum management a pe a, chutih rualin extreme concentrated leh rolling loads te chu permanent deformation awm lovin a tuar thei bawk.
Bithliahna
High Load Raised Access Flooring System te chu a rawn chhuak leh ta a ni
Share to
Hrilhfiahna

Extra-Heavy-Duty sang tak nei Access Floor System|Fineco Global a ni

 

Fineco Extra-Heavy-Duty Raised Access Floor System hi high-density data center, electrical control room rit tak tak, leh industrial infrastructure atana structural capacity danglam tak mamawhna atana engineer a ni. Solid steel shell injected vel a siam niin, high-density, lightweight cementitious core emaw high-strength calcium sulfate core emaw hmanga inject a ni a, he system hian high{6}}capacity cabling leh underfloor air distribution (UFAD) atan rigid underfloor plenum management a pe a, chutih rualin extreme concentrated leh rolling loads te chu permanent deformation awm lovin a tuar thei bawk.

 

Thil pawimawh tak tak

 

Load sang tak-Bearing theihna:CISCA Extra-Heavy-Duty standards zawm tur concentrated point load 6.8 kN (1,500 lbf) atanga 11.1 kN (2,500 lbf) aia tam tan engineer a ni.
Rigid Monolithic hmanga sak dan:Spot-welded top leh bottom steel sheet hian controlled-density cement core a encapsulate a, hollow resonance a ti bo a, torsional rigidity a ti sang hle.
Path Grounding chhunzawm zel:Stringers, pedestals, leh panels inkara metal-to-metal contact direct hian electrostatic discharge (ESD) mitigation rintlak tak a siam thei a ni.
Corrosion-A do thei Finish:Epoxyed leh phosphate-treated steel components te hian underfloor plenum boruak lum tak an tuar thei a ni.

 

System Insiam dan (System Structure) a ni

 

Surface Finish a ni:High-Pressure Laminate (HPL) / Conductive Vinyl / Bare Steel hmanga siam a ni
Top Steel Sheet atanga chhuak:A thuk-drawn SPCC cold-rolled steel (A thuk zawng: 1.2 mm - 2.0 mm)
A bulpui ber: 1.1.Cementious Core rit lo / Calcium Sulfate density sang tak
A hnuai lam Steel Sheet:Embossed/Dimpled SPCC cold-rolled steel hmanga siam a ni
Support Grid ah hian:Heavy-duty bolt-down steel pedestals & snap-tubular stringers-ah te

 

Technical lam thil chi hrang hrang

 

Parameter a ni

A sawifiahna

System hrang hranga inthliarna

Extra-Heavy-Duty (EHD) hmanga lut tur a ni

Panel Dimension hrang hrang

600 mm × 600 mm (Standard) a ni.

Panel Thickness a ni

30 mm / 35 mm / 40 mm a ni

Concentrated Point Load a ni

4.4 kN atanga 11.1 kN (1,000 lbf – 2,500 lbf) thleng a ni.

Uniform Distributed Load (UDL) hmanga siam chhuah a ni.

23,000 N/m2 thleng a ni

Rolling Load (2G / 10G cycle hmanga hman theih) a ni.

Caster wheel khatah 3.56 kN atanga 4.45 kN thleng a ni

Safety Factor a ni

3.0 × aia tam emaw a tlukpui emaw Design Load (Ultimate Failure Test) .

Finished Floor san zawng (FFH) 1.1.

300 mm atanga 1,500 mm (Pedestal hmanga siamrem theih)

Electric hmanga invenna (resistance) a awm

1 × 106 atanga 1 × 109 ohms (Surface-to-Lei)

 

Seismic hnathawh dan (Seismic Performance) a ni

 

Mission-critical facility-te hian seismic event-ah hian structural integrity tihbuai loh an mamawh a ni. Fineco Extra-Heavy-Duty system ah hian:
Rigid Bolt-A hnuai lam Pedestals te chu:Base plate te chu mechanical expansion bolt hmangin subfloor-ah direct-in an anchor a.
Heavy-Duty Lateral Bracing hmanga siam a ni:FFH 800 mm aia sang tan meter 3 inkar a diagonal seismic struts dah.
Compliance Testing neih dan tur:Telcordia GR-63-CORE (Zone 4) leh ASCE 7 mamawh angin test a ni a, seismic shock laiin lateral shear failure leh panel dislodgement a veng thei a ni. (Client submittal file-te tan structural engineering calculation report kimchang a awm).

 

A hman dan tlangpui

 

Hyperscale & Colocation Data Center hrang hrangte chu:Server hall-ah hian heavy blade server cabinet leh battery energy storage system (BESS) dah a ni.
Electrical Substation leh Control Room hrang hrang:SCADA control platform te hian industrial switchgear cabinet rit tak tak te chu a thlawp a ni.
Cleanroom hman dan tur:Semiconductor siamna cleanroom-ah hian particle-free, vibration-damped subflooring a ngai a ni.
Broadcast & Telecommunications hmun hrang hrangah:Master control facility-a high-density cable routing leh hmanrua rit sem chhuah ngai.

 

Installation & Customization hmanga siam a ni

 

Pedestal san zawng siamthat theihna Range:Subfloor inang lo tak takte tan ±25 mm fine-tuning threaded rod design.
Perimeter atanga tanpuina: 1.1.Column cut-outs atan heavy-gauge perimeter wall angle leh edge-trim cutting services te.
Custom Cutouts te chu:Factory-machined cable grommets, brush inserts, leh airflow vent panels (55% open area thleng) te chu thawn chhuah hmaa inzawmkhawm a ni.

 

Standards & Quality te chu a hnuaia mi ang hian a ni

 

CISCA Alement-WF{1}}V1.2: A chhuahna tur hmun leh a hmanna tur hmun:Concentrated, rolling, leh impact load te test a ni.
EN 12825-ah chuan:Grade 6 thlenga structural load performance thlenga thliar hran a ni.
ISO 9001 / ISO 14001 chu a hnuaia mi ang hian a ni.Quality management khauh tak leh environment compliance control hnuaia siam a ni.
Raw Material zawn chhuah theihna:Cold-rolled structural steel coil zawng zawng tan batch khatah Mill Test Certificate (MTC) pek a ni. Third-party verification report (SGS/TÜV) chu dilna angin hmuh theih a ni.

 

Thil siamchhuah & Project puihna

 

Automated Stamping leh Welding hmanga siam a ni:CNC laser cutting leh multi-point projection welding line te hian panel squareness (±0.2 mm tolerance) inang tlang a tichiang a ni.
Epoxy Coating Line hmanga siam chhuah:Electrostatic powder coating, 80-micron film thickness nei, salt-spray-a corrosion laka a him theih nan.
In-In tichhe thei Testing-ah:Universal testing machine te hian crating hmain production lot tinah batch proof-loading an execute a, chu chuan ultimate safety margins a finfiah thin.
Dawr Drawing leh Submittal Package hrang hrang:In-house engineering team hian project brief an dawn atanga darkar 48 chhungin AutoCAD/Revit layout shop drawing, load calculation report, leh seismic calculation te an pe thin.

 

FAQ

 

Q: Extra-heavy-duty application atana calcium sulfate leh cement-filled steel panel te hi eng nge an danglamna?

A: Cement-filled steel panels hian impact resistance leh acoustic dampening tha zawk a pe a, hei hian high-vibration data hall atan a tha hle. Calcium sulfate panel hian inherent fire resistance sang zawk (A1 non-combustible) leh denser screw-retention property a pe bawk. Fineco engineer te chuan i MEP load mamawh bikte chu an evaluate a, core material tha ber tur an recommend thin.

Q: Engtin nge system hian rolling load rit tak hnuaiah deflection a veng ?

A: Kan extra-heavy-duty panels te hian 2.0 mm top steel plate an hmang a, chu chu continuous high-tensile steel stringers bolted to heavy-gauge pedestals nen a inzawm a ni. Hei hian multi-pedestal grid-ah dynamic point load a sem darh a, rolling caster wheel hnuaia panel deflection chu 1.5 mm hnuai lam thlengin a khap (CISCA rolling load testing protocol hmanga verified).

Q: He raised floor system hi underfloor HVAC (UFAD) layout awm tawhte nen a inzawm thei ang em?

A: Ni e. He system hian high-capacity perforated steel panel leh damper-controlled airflow module te a dah thei a ni. Stringer grid heights chu plenum configuration awmsa nen kan match a, layout interface hrang hrangah zero pressure drop emaw air leakage emaw kan tichiang a ni.

Q: Engineering leh seismic submittal atan eng documentation nge pek thin?

A: Third-party test report (CISCA/EN 12825), steel raw materials atana factory mill test certificate, seismic calculation compliance notes (Telcordia GR-63-CORE), leh customized CAD/Revit shop drawing te bakah submittal package kimchang kan pe a ni.

Q: Data center order lian-scale-a standard production lead time chu engzat nge ni?

A: Volume order (square meter 5,000 thleng) atana standard production lead time chu ni 15 atanga ni 20 chhung a ni. Custom cutout, specialized HPL finish, emaw anti-static vinyl laminations te hian hnathawh ni 3 atanga ni 5 chhung a belhchhah thei.