High-Load tihsan Access Floor System a ni
Fineco High-Load Raised Access Floor System hian mission-critical facilities tan structural underfloor plenum management leh heavy-duty load support a pe a ni. He system hi high-density server rack, power distribution unit (PDU), leh industrial control console awmna environment atan engineer a ni a, he system hian high-density core panels te chu cold-rolled steel welded pedestals te nen a thlunzawm a ni. HVAC, power, leh cabling tan underfloor routing chiang tak a pe a, chutih rualin permanent structural deformation awm lovin static leh dynamic load profile na tak tak a tuar thei bawk.
Thil pawimawh tak tak
High-Density sang tak nei Structural Core:Point-load crushing do turin high-density cementitious particle board emaw all-steel welded shell construction emaw a hmang.
Rigid Understructure Grid hmanga siam a ni:Bolted stringer leh pedestal assembly te hian panel te chu rigid horizontal plane ah an lock a, rolling load hnuaiah lateral shifting a awm tawh lo.
A san zawng dik taka siamrem dan:Heavy-gauge threaded steel rod leh locking nuts te hian finished floor height (FFH) 150mm atanga 2000mm thlenga leveling dik tak a siam thei a ni.
Electrostatic Dissipation (ESD) hmanga tihchhiat (ESD): 1.1.Factory-a hman High-Pressure Laminate (HPL) emaw conductive vinyl surface finish te hian surface resistivity 1 × 106 leh 1 × 109 ohms inkar a vawng reng a ni.
System Insiam dan (System Structure) a ni
Floor Panel te chu:Modular panel inthlak danglam theih (a tlangpuiin 600mm × 600mm) te chu venhimna electro-galvanized emaw epoxy-coated steel skins hmanga siam a ni.
Pedestal Assembly neih dan tur chu:Base plate (min. 100cm2), vertical threaded stud (M18/M20), die-cast steel head integrated stringer locating tabs nei, leh leveling nut te a awm a ni.
Stringers te chu:Snap-on emaw bolted tubular steel channels hmangin pedestal heads inzawmkhawmin rigid grid siamin, lateral stability leh uniform load capacity a tisang a ni.
Gasket te chu:Conductive PVC/rubber padding chu pedestal lu-ah a innghat a, hei hian acoustic vibration a ti bo a, metal-on-metal friction a veng bawk.
Technical Specifications & Test tihdikna tur a ni
|
Parameter a ni |
Specification chungchang chipchiar takin |
Certified Standard / Test dan tur a ni |
|
Panel Dimension hrang hrang |
600 mm × 600 mm (Custom size a awm thei) |
Thil siam chhuahna atana tolerance: ±0.2 mm |
|
Standard Panel Thickness a ni |
30 mm / 35 mm / 40 mm a ni |
ISO 9001 QC angin dimensional verification a ni |
|
Core Materials te chu a ni |
Cement hmanga siam chi hrang hrang Board / Calcium Sulfate / Welded Steel Shell hmanga siam a ni |
Density: 1500 kg/m3 (Calcium Sulfate) aia tam emaw, a tlukpui emaw a ni. |
|
Concentrated Load Capacity a awm thei |
CISCA Pawl 8 / Pawl 10 (3.56 kN atanga 4.45 kN) . |
Third-Party Verified: SGS Test Report chu file-ah a awm |
|
Ultimate Load theihna a awm |
11.1 kN aia tam emaw, a tlukpui emaw |
CISCA / EN 12825 kalphung angin test a ni |
|
Load Capacity inang tlang tak a ni |
15 kPa atanga 22 kPa thleng a ni |
Permanent deflection sang ber < 0.25 mm a ni |
|
Finished Floor san zawng (FFH) 1.1. |
150 mm atanga 2000 mm thleng a ni |
M18/M20 heavy-gauge steel rod hmanga siamrem theih a ni |
|
Surface Resistivity a awm thei |
106 atanga 109 ohms thleng a ni |
EOS/ESD S7.1 ah test a ni |
Seismic hnathawh dan (Seismic Performance) a ni
Structural integrity khauh tak mamawh seismic zone-a deployment atana duan a ni.
Lateral Load laka inven theihna:Heavy-duty bolted stringer connection leh structural seismic gussets hmangin horizontal shear force a tuar thei.
Sway tihziaawmna tur:Subfloor substrate-a anchored diagonal bracing tubes a dah tel a, seismic event-a lateral displacement tam lutuk chu a khap tlat a ni.
Chhanna chak tak: 1.1.Dynamic structural oscillations laiin pedestal head atanga panel dislodgement venna atana engineer a ni.
A hman dan tlangpui
Hyperscale Data Center hrang hrangte chu:High-density server rack, blade server, leh battery backup system rit tak tak te a support. (Tun hnaia hman: Tier III Data Center Facility, Frankfurt, Germany-a m2 12,000-a zau).
Colocation neih theihna tur hmun:Multi-tenant server hall-a reconfiguration neih fo ngai tan modular adaptability a pe.
Industrial Control & SCADA Room hrang hrangte chu:Automation console rit tak tak, electrical switchgear, leh monitoring terminal te a awm bawk. (Tun hnaia hman tan: Regional Power Grid Dispatch Control Center).
Thianghlimna hmun leh Semiconductor Labs te:Particle siam chhuah a control a, high-volume underfloor conditioned air distribution (laminar airflow) a enkawl bawk.
Installation & Customization hmanga siam a ni
Subfloor buatsaih dan: 1.1.Concrete slab thianghlim, leveled, anti-dust concrete sealer hmanga enkawl a ngai.
Installation Tolerances te chu:Laser leveling instrument hmanga dah a ni a; vertical height tolerance chu meter 5-a thuiah ±1.5 mm-ah tihkhawtlai a ni.
Custom Cutouts te chu:Factory emaw site-machined cable grommets, brush tiles, leh directional airflow grates (perforation rates 15% atanga 55%) te chu layout-ah direct-in an inzawm khawm a ni.
Standards & Quality te chu a hnuaia mi ang hian a ni
International testing protocol zawm chunga siam:
CISCA (Ceiling & Interior Systems siamtu pawl):Access floor hrang hranga performance specification siam a ni.
EN 12825-ah chuan:Raised access floors standard (Breking load leh deflection hmanga classified) a ni.
ASTM E84 chuan:Lei chung kang dan (Flame Spread Index 0, Smoke Developed Index 25 aia tlem emaw, a tlukpui emaw).
ISO 9001 a ni:Raw material sourcing, stamping, welding, leh coating process te enkawltu quality management system te.
Thil siamchhuah & Project puihna
Production hmanrua: 1.1.Automated multi-station steel stamping press, robotic MIG welding cell, leh electrostatic powder coating line te a awm bawk.
In-In chhunga Testing neihnaah:Production batch tin hian concentrated, rolling, leh ultimate load limits te chu destructive proof-load testing an nei vek a.
Engineering lama tanpuina:Custom CAD layout siam chhuah, load distribution chhut dan, leh on-site technical supervision package te chu deployment lian tak tak-na atan.
Zawhna Zawh fo thin
Q: He system hian concentrated load capacity sang ber chu engzat nge ni a, engtin nge test a nih?
A: Kan heavy-duty panels te hian concentrated load 4.45 kN (CISCA Grade 10) thleng a support a, permanent deflection 0.25 mm aia tlem a nei bawk. Testing-ah hian CISCA leh EN 12825 guidelines angin panel chak lo ber (center edge emaw corner emaw)-ah 25 mm × 25 mm indenter foot hman a ni a, hei hi certified third-party laboratory report-in a thlawp a ni.
Q: Installation laiin server rack rit tak tak atanga rolling load lo chhuak chu engtin nge system hian a handle?
A: System hian bolted stringer grid framework a hmang a, chu chu high-density cementitious emaw all{1}}steel welded panels nena inzawm a ni. He configuration hian dynamic rolling load (cycle 10,000 hmanga 4.5 kN rolling load thlenga test) chu pedestal tam takah a sem darh a, localized panel collapse emaw stringer buckling emaw a veng thei a ni.
Q: High-load application atana calcium sulfate leh cementitious particle board core te hi eng nge an danglamna?
A: Cementitious particle board hian initial compressive strength sang tak leh moisture resistance tha tak a pe a, hei hian standard data center environment atan a man tlawm-a ti hlawk hle. Calcium sulfate cores hian kangmei laka invenna tha zawk (A1 non-combustible), density sang zawk, exceptional acoustic damping, leh extreme load condition tan ultimate load threshold sang zawk a pe a ni.
Q: He raised floor system hi seismic zone mamawh awmsa nen a inzawm thei ang em?
A: Ni e. Seismic Zone 3 leh 4 tan chuan heavy-duty seismic pedestal heads, heavy gauge stringers, leh structural lateral bracing struts te kan supply a, chu chuan pedestal network chu structural slab-ah direct-in a khin a, torsional twisting leh structural collapse a veng thei a ni.
Q: International project shipment-a lead time leh packaging specification te chu engte nge ni?
A: Standard production lead time hi volume leh custom cutout mamawh dan azirin ni 20 atanga ni 30 inkar a ni. Panel te hi ISPM 15-compliant heat-treated wooden pallets-ah vertical-in stack a ni a, edge-high-density foam hmanga venhim a ni a, steel banding hmanga strapped a ni a, tuipuiah bungraw phurh himna tur waterproof stretch film-a khuh a ni bawk.
hot tags .: high-load raised access floor system, China sang-load raised access floor system siamtu, supplier, factory